Submit Your Information Below
Upgrading your bathroom vanity and bathroom cabinet installation improves storage, style, and daily functionality in your Baltimore home. Whether you’re renovating a Federal Hill row house or updating a Canton bathroom, we handle the complete installation process from start to finish.
Our licensed plumbers and skilled installers manage prep work, water line connections, secure wall mounting, and leak-free plumbing. We work with Baltimore’s older plaster walls, uneven floors, and mixed plumbing systems to deliver professional results. From master bath bathroom remodeling projects to powder room updates, your new vanity will fit perfectly, sit level, and function reliably for years to come.
Posted on William Kinsman2025-10-14Trustindex verifies that the original source of the review is Google. Extremely personable crew, very respectful, high quality work. Has never fallen short once in the multiple jobs ive had for them. Had them tear up our parking pad most recently.Posted on Roger Brown2025-10-12Trustindex verifies that the original source of the review is Google. Trademark did an excellent job with constructing my house. Travis was proficient at supplying excellent vendors and companies to complete the construction. The construction was completed on time and without any flaws. Almost six years from my date of occupancy, his work has withstood the test of time. Aside from power and window washing, the house has required no additional maintenance. Prior to construction, Travis was very helpful in suggesting design changes which increased space for a minimal increase in cost.Posted on Karen Kelch2025-10-09Trustindex verifies that the original source of the review is Google. Update: we had Trademark back to install a new matching dishwasher, range, and range hood. The work included a new full electrical line for the range as we switched from a "dual fuel" to a full gas range and only needed a 120 outlet. The fit is excellent, all materials and trash removed, old appliances disposed of, all working. Thank you Marvin and Mike :-) After a great experience with a total bathroom renovation back in 2012, we again had Trademark perform a smaller job this time - remove a 38 year old SubZero built-in and rework the space for a counter-depth refrigerator. As the SubZero was much taller and left a large opening above the new refrigerator, their designer Nona spotted a fix immediately: remove the larger wood panel that matched the cabinets from the SubZero, size and then mount it to create the appearance of a matching cabinet above the new refrigerator. Their carpenters Marvin and Mike did great work with the wood panel and the rest of the "box", creating an attractive install rather than a "workaround". As we're planning a total kitchen renovation later in the year, this was a great solution to let us install a freezer that actually stays cold now until we're ready for the rest of the renovation :-)Posted on Charles James2025-09-26Trustindex verifies that the original source of the review is Google. I can't say enough good things about Trademark Construction! They completely renovated our kitchen and bathroom in Annapolis, MD, and the entire process was flawless. From the initial online scheduling to the design process and final installation, the customer service was excellent and the workmanship was top-notch. They made what could have been a stressful experience incredibly smooth and easy. If you are looking for a kitchen or bath remodeling company in the Annapolis area, I highly recommend Trademark Construction!Posted on Brittney Youndt2025-09-16Trustindex verifies that the original source of the review is Google. My husband and I bought cabinets and a countertops from Vasilios, and it was a great experience. He could not have been any nicer and we got a great deal. Definitely recommend! Great people!Posted on Mary Jane Reintzell2025-09-08Trustindex verifies that the original source of the review is Google. Excellent customer service. Nona is fantastic. Great expertise in planning, design layout. Marvin and Mike great craftsmen. Highly recommend. You won't be disappointed.Posted on Michelle2025-09-05Trustindex verifies that the original source of the review is Google. This is our second time working with Trademark Construction, and we couldn't be happier. We were so impressed with the kitchen and bath renovation they did for us five years ago that we didn't hesitate to hire them again for a major kitchen remodel in our new Towson home. From start to finish, Vasilios and his team consistently deliver exceptional service. We love that their easy online scheduling and the small consultation fee are both incredibly valuable. We were also very impressed with their professionalism and project management abilities. They use online software that allows us to see the schedule and monitor our entire project from start to finish. Trademark Construction is not only MHIC licensed, but they also hold a master plumbing license, which allows them to handle all plumbing installations. This is a huge bonus! We highly recommend them for any kitchen, bathroom, basement, or full-home remodel.Posted on Tom Paradis2025-06-06Trustindex verifies that the original source of the review is Google. Vasilios and the Trademark Construction Team was extremely helpful with helping me select and order the Onyx Collection solid surface shower kit. The material was priced fairly , well packed in protective shipping material, and delivered exactly according to plan. The Team also has offered to provide any assistance that I may need when I install it. I recommend Trademark Construction and Onyx Collection material for any remodeling projects.
If you live in a Federal Hill row house or Hampden bungalow, moving water lines or updating shutoff valves requires a licensed plumber. Baltimore’s older homes often have copper, galvanized, or lead pipes, especially in properties built before 1978. Licensed plumbers understand how to work safely with these mixed plumbing systems and prevent future leaks that damage walls and floors.
We hold a Master Plumbing License, which means we handle both the plumbing and carpentry aspects of your vanity installation. You won’t need to coordinate between multiple contractors, saving you time and avoiding the communication gaps that lead to delays.
Baltimore requires permits for plumbing changes in older homes, particularly those with lead pipes. Our plumbers obtain the correct permits and ensure all connections meet Maryland code requirements, protecting your home and your investment.
Water line work includes installing new shutoff valves under the vanity, connecting supply lines to your faucet, and thoroughly testing all connections for leaks before completing the job. Proper installation prevents the water damage that results from DIY attempts or work done by unlicensed contractors who skip critical steps.
Families in Canton or Fells Point installing heavy double vanities need secure wall mounting to prevent tipping and ensure safety. A vanity with a stone countertop, two sinks, and daily bathroom items can weigh several hundred pounds.
Without proper anchoring to wall studs, this weight gradually pulls the cabinet away from the wall, creating gaps where water seeps behind the vanity and damages your walls. We locate wall studs behind your bathroom walls and drive screws through the vanity’s mounting rail directly into solid wood framing.
This anchoring method supports the full weight of your countertop and handles daily use without the cabinet separating from walls. Multiple attachment points spread across the vanity’s width distribute the weight evenly and create lasting stability.
Older plaster walls in Baltimore row homes require careful stud location and toggle bolts for hollow sections between studs. Plaster cracks easily when drilled in the wrong location, so we use stud finders and test holes to confirm framing positions before installing mounting hardware.
For sections between studs on exterior walls, we install heavy-duty toggle bolts that spread the load across a wider wall area. This combination of stud mounting and toggle bolts creates a secure installation that lasts for decades.
When planning a full bathroom remodel, install your bathroom flooring before placing the vanity. This approach gives you flexibility if you want to change your vanity style in the future. Installing tile, vinyl, or other flooring materials under the cabinet allows easy replacement years later without leaving unfinished floor gaps that won’t match your existing materials. When flooring stops at the vanity edge, any future cabinet change requires hiring a flooring contractor to patch the exposed area.
Continuous flooring under your vanity also protects against water damage from slow leaks and Baltimore’s high humidity. Our humid summers cause tile and vinyl to expand, which makes proper underlayment essential beneath vanities. Without continuous flooring, moisture seeps into the exposed subfloor and causes rot that spreads beyond the visible cabinet area, leading to costly structural repairs.
We install moisture barriers and underlayment across your entire bathroom floor before setting the vanity. While this adds one extra day and minimal cost during initial construction, it saves significant money during future renovations. You’ll be able to swap vanity styles in ten or fifteen years without the expense and hassle of patching floor gaps.
Proper wall preparation and updated plumbing rough-ins are essential before installing your new vanity. We create smooth, level wall surfaces by patching holes from old mounting hardware, skim coating uneven plaster, and painting before your cabinet arrives. This preparation ensures your vanity sits flush against the wall and positions plumbing outlets at the correct heights for secure, leak-free connections.
Plumbing rough-in work involves positioning water supply lines and drain pipes at heights that match your specific vanity model. Supply lines should emerge from the wall 20-22 inches above the finished floor for most vanities, while drain pipes center at 16-20 inches depending on your sink type. Getting these measurements right during rough-in prevents connection problems and the need for costly adjustments during final installation.
Baltimore building codes require GFCI outlets within six feet of sinks to protect against electrical shock in wet bathroom areas. We install or upgrade outlets to meet current code before placing your vanity, ensuring your installation passes inspections and keeps your family safe.
Proper vanity installation requires careful sequencing and precise connection methods. Following the correct steps prevents uneven countertops, drain leaks, and cabinet damage from improper mounting.
Each phase builds on the previous work to create a finished installation that functions reliably and looks professionally completed, which is why most homeowners in Locust Point and throughout Baltimore choose to hire experienced installers rather than attempt DIY installation.
Installation sequence matters because some steps can’t be undone without damaging completed work. Setting a vanity before checking level placement creates gaps under the countertop and prevents doors from closing properly.
Connecting plumbing before securing the cabinet to walls makes position adjustments difficult and requires disconnecting water lines. Our installers follow proven methods that get it right the first time.
Baltimore’s older homes often have uneven floors that require shim adjustments during leveling. We place shims under low corners until the cabinet sits perfectly level in both directions, then secure them to prevent shifting over time.
This leveling work prevents countertop cracking from uneven support and ensures your vanity doors align properly. After securing the cabinet, we trim visible shim ends and caulk the base to create a finished appearance.
Installing a bathroom vanity in Baltimore involves these steps:
Baltimore’s older homes often require shims to level vanities on uneven floors and toggle bolts for secure mounting in plaster walls common to row homes. If you’re moving water lines or working with lead pipes, you’ll need a licensed plumber and permits to meet Maryland code requirements.
Submit Your Information Below
In-home meeting (up to 2 hours) to understand project vision, discuss feasibility, style, materials, and ballpark budget
Detailed design work, CAD drawings, site analysis, structural evaluation, mechanical/electrical assessment, and preliminary designs
Clients visit their on-site showroom where the design team helps select cabinets, countertops, appliances, flooring, fixtures, lighting, and tile within budget parameters
Scope and budget finalized, Construction Agreement created, target dates set, permits filed
Follows detailed written building processes with step-by-step procedures
Owner Vasilios personally conducts a detailed walk-through to ensure satisfaction
You need a plumber if you’re moving water lines, updating shutoff valves, or working with lead pipes common in older Baltimore homes. Basic vanity replacements using existing plumbing connections may not require a licensed plumber.
Flooring should extend under your vanity with a moisture barrier to protect against Baltimore’s humidity. Installing continuous flooring allows future cabinet replacement during bathroom renovation projects without patching floor gaps.
We drive heavy-duty screws through the vanity mounting rail into solid studs found behind plaster. For areas between studs, we add toggle bolts to spread weight across wider wall sections.
Install flooring first for easier future vanity replacement and to prevent moisture damage in gaps around the cabinet base. This saves money during future bathroom remodels when you want to change vanity styles.
Basic replacement takes 3-4 hours when using existing plumbing connections. Installations requiring plumbing changes, wall repair, or adjustments for older home layouts take 6-8 hours.